Timber retaining is a cost effective option which can be pleasing to the eye when constructed well.
Construction usually involves battering back the area, drilling
to depth and concreting in the timber poles. Whalers are installed
after the concrete is set, then drainage material is used behind the
wall to engineers specifications.


- Six custom-built innovations make up this entry. They are a pile carrier, a splicing robot, concrete pile shaver, weather-tight welding container, sheet pile cleaner and a forklift-mounted pile tester; all of which enhance worker safety and boost productivity.