Tauhara Substation Tower Foundation Piling Works
Sector: Belled Reinforced Concrete Piles & Drilling Under Fluids
Location: Taupo
Client: Northpower
For Northpower, Spiral Drillers installed 8 x 1200mm diameter Reinforced Concrete Piles, up to 18 metres deep, for Pylon Foundations for a new geothermal Power Station in Tauhara.
Our team completed the project at Tauhara ahead of schedule. Scope of Works included Belled Piles, Drilling under fluids: Bentonite, Permanent Casings, and Stub Setup.
We consistently exceeded expectations from the initial stages of the project through to its successful completion.